HT Panel Installation (CPRI Approved)

COREPLEX SOLUTIONS LLP provides professional HT panel installation, erection, testing and commissioning services for industrial, commercial and infrastructure electrical systems. Our experienced engineering team ensures proper installation, alignment, bus-bar assembly, cable termination, earthing, protection coordination and commissioning of high-tension switch gear.

We undertake installation of HT panels and associated electrical equipment in accordance with approved drawings, applicable electrical standards, manufacturer recommendations and project specifications. Our focus is on operational safety, system reliability, quality workmanship and seamless integration with the electrical distribution network.

Our Scope of Work

  • HT panel shifting, erection and installation
  • Panel alignment, leveling and fixing
  • Bus-bar assembly and inter-panel connections
  • HT cable termination and connection
  • Earthing and bonding
  • Protection relay setting and verification
  • VCB testing and functional checks
  • Electrical interlock verification
  • Testing and commissioning
  • Final inspection and documentation

We deliver dependable HT switch gear installation solutions designed to ensure safe, efficient and reliable power distribution.

Testing & Commissioning Checklist

Test / InspectionPurpose
Insulation Resistance (IR) TestVerify insulation integrity
Contact Resistance TestVerify contact quality
VCB Mechanical OperationVerify breaker operation
VCB Timing TestCheck opening & closing timings
Primary Injection TestVerify protection circuit performance
Secondary Injection TestVerify relay operation and settings
CT/PT Ratio & Polarity TestVerify instrument transformer connections
Protection Relay TestingCheck OC, EF and other protection functions
Interlock VerificationConfirm electrical & mechanical interlocks
Earthing Continuity TestVerify grounding connections
Functional & Trip TestConfirm complete system operation
Final EnergisationControlled commissioning and operational verification

Safety requirement

HT installation and commissioning must be carried out by qualified HT electrical personnel under an approved shutdown, isolation, lockout/tagout (LOTO), discharge and earthing procedure, with appropriate PPE and authorization.